Number of new residential consents by building type, 12 month rolling total (January 2011 - October ...
Published: 16 Dec 2021
Type
File
XLSX, 14KB, 1 page
XLSX, 14KB, 1 page
The 2021 National Construction Pipeline Report provides a projection of building activity for the next 6 years through to the end of 2026.
PDF, 1.6MB, 62 pages
This infographic summaries the key findings from the National Construction Pipeline Report 2021. The Ministry of Business, Innovation and Employment (MBIE) commissioned BRANZ and Pacifecon to provide a six year forward view of national building and construction activity.
PDF, 255KB, 1 page
Cabinet agreed to request the Commerce Commission to undertake a market study into residential building supplies.
PDF, 137KB, 3 pages
Cabinet paper requesting the Commerce Commission to undertake a market study into residential building supplies.
PDF, 302KB, 9 pages
Signed Notice from the Minister of Commerce and Consumer Affairs requiring the Commerce Commission to carry out a competition market study into residential building supplies with the included terms of reference.
PDF, 48KB, 1 page
The technical report provides detailed findings from the research and includes the research collateral.
PDF, 3.3MB, 275 pages
The summary report provides an overview of the key findings from the research.
PDF, 1MB, 35 pages
An annual report on the key trends on the building and construction sector from July 2020 to June 2021.
PDF, 1.8MB, 42 pages
An initial evaluation of the earthquake-prone buildings (EPB) system between August 2019 and January 2020 to gain early insights on how well the system is working, and identify areas for improvement.
PDF, 967KB, 48 pages
Crown copyright © 2024
https://www.mbie.govt.nz/document-library
Please note: This content will change over time and can go out of date.