Filter Results
Content type
Topic
Sub-topic
Clear all
Clear all
Displaying 1 - 10 filtered results of 17 for:
current work
NZ Battery Project

The NZ Battery Project was set up in 2020 to explore possible renewable energy storage solutions for when our hydro lakes run low for long periods. A pumped hydro scheme at Lake Onslow was one of the options being explored. The Government stopped the Lake Onslow investigations in late 2023. MBIE is continuing work on the question of security of supply during extended periods of low hydro inflows as part of its wider electricity system work programme. The following documents were produced as part of the NZ Battery Project.

  • 1
  • 2