Cultural Values Statement: The Lake Onslow option for the New Zealand Battery Project Phase 1B – A...
Published: 17 Jun 2024This report provides a cultural assessment of a wider area around Lake Onslow.
Type
File
PDF, 2.2MB, 59 pages
This report provides a cultural assessment of a wider area around Lake Onslow.
PDF, 2.2MB, 59 pages
This landscape assessment is to assess the landscape and visual values of Lake Onslow and surrounding areas which will contribute to a study to look at options to meet New Zealand’s dry year electricity problem and in particular the investigation into a possible pumped hydro scheme at Lake Onslow.
PDF, 5.7MB, 42 pages
Cabinet paper proposing the Gas (Levy of Industry Participants) Regulations 2024 is approved for submission to the Executive Council.
PDF, 207KB, 11 pages
Analysis on whether the Minister for Energy should accept or reject Gas Industry Company Limited’s annual levy recommendation.
PDF, 397KB, 21 pages
Cabinet authorised submission of the Gas (Levy of Industry Participants) Regulations 2024 to the Executive council.
PDF, 206KB, 3 pages
Submission template form to provide feedback on the work health and safety regulatory system.
DOCX, 1.3MB, 11 pages
Summary of the consultation document, Have Your Say on Work Health and Safety.
PDF, 974KB, 2 pages
Seeking feedback on the purpose and performance of the work health and safety regulatory system.
PDF, 939KB, 14 pages
Use this template to complete your reporting requirements for the PreSeed Accelerator Fund
DOCX, 157KB, 4 pages
Report of the survey of domestic electricity prices for 15 May 2024.
PDF, 352KB, 2 pages
Crown copyright © 2024
https://www.mbie.govt.nz/document-library
Please note: This content will change over time and can go out of date.