MBIE consulted on a proposal to extend the transition period for Acceptable Solution H1/AS1 and Verification Method H1/VM1 Fifth Editions (first issued on 29 November 2021) for housing.
Displaying 1 - 10 results of 18 for:
Transition period for the energy efficiency of housing
Consultation document seeking feedback on a proposed amendment to the transition period for the energy efficiency of housing contained in Acceptable Solution H1/AS1 and Verification Method H1/VM1.
pdf, 576 KBQuestion on the transition time of 12 months for the proposed H1/AS2 and H1/VM2 changes to take effect.
This section covers energy efficiency for large buildings greater than 300m squared other than housing.
This section covers energy efficiency for all housing, and small buildings up to 300m squared.
Introduction to how the Building Code regulates minimum insulation requirements through clause H1 Energy Efficiency.
Side by side visual comparison showing changes between the current Acceptable Solution H1/AS1 5th edition and a proposed 6th edition.
There has already been significant work to support the energy transition.
The Ministry of Business, Innovation and Employment (MBIE) has extended the time to comply with new wall, floor, and roof insulation requirements in new homes by a further 6 months to 1 May 2023.
- 1
- 2