3.17. Transition period for large buildings H1/AS2 & H1/VM2

Question on the transition time of 12 months for the proposed H1/AS2 and H1/VM2 changes to take effect.

SQ15. Do you agree with the proposed transition time of 12 months for the proposed changes to take effect? 

  • Yes, it is about right.
  • No, it should be longer (24 months or more).
  • No, it should be shorter (less than 12 months).
  • Not sure/no preference.