CTV Building - Non-linear analysis report
Published: 9 Feb 2012Non-leanear seismic analysis report on the CTV Building
Type
File
PDF, 4.5MB, 154 pages
Non-leanear seismic analysis report on the CTV Building
PDF, 4.5MB, 154 pages
Details the findings of the investigations into four buildings that failed during the 22 February 2011 aftershock: The CTV Building, Pyne Gould Corporation Building, the Hotel Grand Chancellor Building and the Forsyth Barr Building.
PDF, 10MB, 207 pages
Report setting out the former Department of Building and Housing (now MBIE) response to recommendations on why four multi-storey buildings in the Christchurch CBD failed during the February 2011 aftershock.
PDF, 1.5MB, 52 pages
Part three of the final report into the reasons for the collapse of the CTV Building, including appendices A-K
PDF, 17MB, 193 pages
Part one of the final report into the reasons for the collapse of the CTV Building.
PDF, 13MB, 111 pages
Part two of the final report into the reasons for the collapse of the CTV Building.
PDF, 4.7MB, 38 pages
Appendix L of the final report containing structural drawings of the CTV Building and the configuration and condition of structural remnants from the debris.
PDF, 2.5MB, 40 pages
Final report into the technical investigation into the reasons for the collapse of the CTV Building, documenting the configuration and condition of structural remnants that may assist in identifying reasons for the collapse of the building.
PDF, 13MB, 166 pages
Testing methodology and results of testing at the 30-month mark into the efficacy of brush-on remedial treatments treatments on Radiata pine framing.
PDF, 1.2MB, 43 pages
Investigation into why the Pyne Gould Building collapsed during the 22 February 2011 earthquake
PDF, 2.2MB, 51 pages
Crown copyright © 2025
https://www.mbie.govt.nz/document-library
Please note: This content will change over time and can go out of date.