Building and construction consultations
-
Work with engineered stone and materials containing crystalline silica
- Minister's foreword
- Executive summary
- Introduction
- Current risk requirements
- Problem definition
- Options for working with engineered stone and materials containing crystalline silica
- Closing remarks
- Summary of all consultation questions
- Glossary
- Annex I: Silicosis and engineered stone background
- Annex II: Overview of the health and safety regulatory regime
- Annex III: Revised Workplace Exposure Standard
- Annex IV: Further information on the status quo
- Annex V: Australia’s amendments to its regulatory settings in response to the risks posed by RCS
- Making it easier to build granny flats (2024)
- Building Code fire safety review discussion document
- Review of the building consent system (snapshot)
- Proposed amendments to the BuiltReady Scheme Rules public consultation
-
Building consent system review: Options paper summary of submissions
- Introduction
- Key themes from submissions
- Promoting competition in the building regulatory system
- Removing impediments to product substitution and variation
- Strengthening roles and responsibilities
- New assurance pathways
- More efficient and streamlined delivery of building consent services
- Better performance monitoring and system stewardship
- Better responding to the needs and aspirations of Māori
- Addressing the interface between the building and resource consent system
- Submitter details
-
Improving efficiency in the inspection process: Discussion document
- Use of information
- Minister's foreword
- Introduction
- Increasing the uptake of remote inspections
- Section one: Options to increase the uptake of remote inspections and improve efficiency of inspection processes
- Section two: Increasing inspection capacity through the use of Accredited Organisations (Building)
- Appendix one: Full list of consultation questions
- Appendix two: Summary of options for feedback
-
Consultation document: Insulation requirements in housing and other buildings
- 1. Introduction
- 2. Insulation in housing and small buildings
- 3. Insulation in large buildings
- Appendix A: Proposed changes to Acceptable Solution H1/AS1 Energy Efficiency for all housing, and bu
- Appendix B: Proposed changes to Verification Method H1/VM1 Energy Efficiency for all housing, and buildings up to 300m squared
- Appendix C: Proposed changes to Acceptable Solution H1/AS2 Energy Efficiency for buildings greater than 300m squared
- Appendix D: Proposed changes to Verification Method H1/VM2 Energy Efficiency for buildings greater than 300m squared
-
Work with engineered stone and materials containing crystalline silica
Glossary
On this page
-
ACC
Accident Compensation Corporation
-
ASAP
Accelerated Silicosis Assessment Pathway
-
CT
Computed Tomography
-
Good Practice Guide
Good Practice Guide for the Control of Respirable Crystalline Silica in the Fabrication of Engineered Stone
-
HSW Act
Health and Safety at Work Act 2015
-
IMPAC
Impac Services Limited
-
MBIE
Ministry of Business, Innovation and Employment
-
NZESAG
New Zealand Engineered Stone Advisory Group
-
PES
Prescribed Exposure Standard
-
PCBU
Person Conducting a Business or Undertaking
-
PPE
Personal Protective Equipment
-
RCS
Respirable Crystalline Silica
-
WES
Workplace Exposure Standard
-
WHS
Work Health and Safety
-
WorkSafe
WorkSafe New Zealand